The installation of the new nest box will take place this afternoon starting around 1 PM. This will include the replacement of the platform with new plywood and installation of three new HD cameras: Camera 2, Camera 3, and Camera 4. Camera 1 will be replaced at a later date.
The cameras at the Times Square building will be turned off during the work, which is expected to be completed by 5 PM.
We're doing some rewiring inside the Times Square Building today in preparation for a new nest box and some new cameras. As part of this, we'll be pulling the plug on Camera 4.
Installation of the box and cameras should take place later this week.
Workers removed the nest box at Times Square so it can be replaced with a new one. I knew it was going to happen eventually but didn't know it was scheduled for today. Sorry for no announcement.