THE FORUM

21-Nov-24, 12:36:42 PM *
Welcome, Guest. Please login or register.

Login with username, password and session length
Note: The views expressed on this page are not necessarily those of GVAS or Rfalconcam.
 
   Home   Help Search Calendar Login Register  
Pages: [1]   Go Down
  Print  
Author Topic: A new ramp is on the way  (Read 1314 times)
0 Members and 1 Guest are viewing this topic.
Shaky
Bathrobe Brigadier
Administrator
Never Leaves 'Puter
*********

Like Count: 354
Offline Offline

Posts: 7,128


Working on my book


View Profile WWW
« on: 09-Dec-21, 07:36:51 AM »

This morning, we will be replacing the eyas ramp at the Times Square Building. The ramp is there to allow any eyas that drops down into the well the ability to climb back up to the nest box.

The cameras at TSB will be shut down during the installation of the ramp, which will start around 9:30 am and last for an hour or two.
Logged

Kris G.
Never Leaves 'Puter
*********

Like Count: 166
Offline Offline

Posts: 7,477



View Profile
« Reply #1 on: 09-Dec-21, 09:23:23 AM »

This morning, we will be replacing the eyas ramp at the Times Square Building. The ramp is there to allow any eyas that drops down into the well the ability to climb back up to the nest box.

The cameras at TSB will be shut down during the installation of the ramp, which will start around 9:30 am and last for an hour or two.

               thumbsup
Logged

Pages: [1]   Go Up
  Print  
 
Jump to:  

Powered by SMF 1.1.21 | SMF © 2015, Simple Machines

Sponsored By

Times Square
powered by Shakymon